August 15, 2015 Transportation, Infrastructure and EnergyOn Sunday, August 30th, from 7am until noon, there will be a full lane closure of the Hillsborough Bridge, along with some intermittent full bridge closures.The full bridge closures will be no longer than 15 minutes at any given time. This closure will not affect emergency vehicles, as they will be waived through as required. Signage will be in place.The lane and bridge closures are necessary to conduct load testing on the bridge in response to requests for an active transportation corridor and potential sanitary sewerage force main installation. Media Contact: Katie MacDonald